NO. | PROJECT & LOCATION | DURATION | SCOPE OF WORK | OWNER / CLIENT | INSPECTION / |
SUPERVISION | |||||
1 | ELECTRICAL & | 6-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SAUDI ARAMCO | |
INSTRUMENTATION | 2005-2006 | ELECTRICAL, INSTRUMENTATION AND SCADA | Saudi Aramco | INSPECTIONS | |
AND SCADA | SYSTEMS FOR RTUS ON WELL HEADS | DEPARTMENT | |||
FOR HARADH GOSP-3 | 1. ELECTRICAL | ||||
STARTUP WELLS | a. Main Power supply | ||||
HARADH, SAUDI ARABIA | b. L.V Transformers | ||||
c. Power Panel Boards | |||||
d. Starters, Pushbutton stations. | |||||
e. Disconnect switches | |||||
f. Switch Racks, Cable trays, conduits and fittings | |||||
g. LV cables | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. SCADA control cabinets | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Switch Racks, Cable trays, RGS/PVC coated | |||||
conduits and fittings | |||||
g. Control, instrumentation & comm: cables | |||||
h. Termination & loop checks | |||||
i. Precommissioning & startup. | |||||
2 | ELECTRICAL & | 8-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION | 2006-2007 | ELECTRICAL & INSTRUMENTATION WORKS | Saudi German | Saudi Engineering | |
AT SAUDI GERMAN PLANT | 1. ELECTRICAL | Industries-Dammam | Dammam | ||
FOR NON WOVEN FIBRE | a. MV Package substations | ||||
DAMMAM INDUSTRIAL | b. Ring Main Units | ||||
AREA-II | c. Distribution Transformers | ||||
d. LV switchgears | |||||
e. Power Bus Ducts | |||||
f. Motor control centres | |||||
g. Panel Boards, starters, Pushbutton stations. | |||||
h. Disconnect switches | |||||
i. Lighting system | |||||
k. Pipe Racks, Cable trays, conduits and fittings | |||||
l. HV/LV cables | |||||
m Control cables | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. DCS control consoles | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Pipe Racks, Cable trays, conduits and fittings | |||||
g. Control, digital & analog cables | |||||
h. Termination & loop checks | |||||
h. Precommissioning & Plant startup. | |||||
3 | ELECTRICAL & | 12-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION | 2006-2007 | ELECTRICAL & INSTRUMENTATION WORKS | JANA | HASSAD | |
AT JANA PLANT | 1. ELECTRICAL | ||||
JUBAIL INDUSTRIAL | a. MV switchgear Lineup | ||||
AREA | b. Power Transformers | ||||
c. Distribution Transformers | |||||
d. Rectifier transformers | |||||
e. Power Bus Ducts | |||||
f. LV switchgears | |||||
g. Motor control centres | |||||
h. Power factor correction equipment | |||||
i. Panel Boards, starters, Pushbutton stations. | |||||
k.Disconnect switches | |||||
l. Pipe Racks, Cable trays, conduits and fittings | |||||
m HV/LV cables | |||||
n. Control cables | |||||
0. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. DCS control consoles | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Pipe Racks, Cable trays, conduits and fittings | |||||
g. Control, digital & analog cables | |||||
h. Termination & loop checks | |||||
h. Precommissioning & Plant startup. | |||||
3. COMMUNICATION WORKS | |||||
a. Cable trays, RGS conduits and fittings | |||||
b. SCADA control consoles | |||||
c. Data cables | |||||
d. Data outlets | |||||
e. Termination & loop checks | |||||
f. Precommissioning & startup. | |||||
4 | TIMELINE SADAF | 1.5-MONTH | DCS CONTROL, HMI & ELECTROMECHANICAL | SADAF | ABB- |
EDC T/A 2007 | Jan-Feb 2007 | WORKS DURING SHUTDOWN PERIOD | SWITZERLAND | ||
SAUDI PETROCHEMICAL | 1. CONTROL ROOM | ||||
CO. (SADAF) JUBAIL | a. Removal of existing HMI. | ||||
b. Installation of New HMI | |||||
c. Disconnect & removal of existing control cables | |||||
d. Installation of New Control cables from | |||||
Marshalling rack to New HMI | |||||
f. Modification of existing DCs Panel to increase | |||||
Capacity | |||||
2. RECTIFIER TRANSFORMERS – 6 EA | |||||
a Dismental & remove existing power & control | |||||
wiring for rectifier transformers including control | |||||
panel. | |||||
b. Installation of New control panel for rectifier | |||||
transformers. | |||||
c. Modification work at Pan alarm panel | |||||
d. Installation of cotnrol & communication wiring | |||||
from rectifier transformer and marshalling racks. | |||||
e. Preloop checks & final loop checks. | |||||
f. Replacement of RTD’s at rectifier transformer | |||||
g. Replacemnt of existing switches & transmitter. | |||||
3. MECHANICAL WORKS | |||||
a. Cleaning of rectifier transformer bushing with | |||||
Demi water. | |||||
b. Replacement of gaskits. | |||||
c. Replacement of mehcanical piping at various | |||||
Locations. | |||||
d. Re-circulation & Dehumidification of | |||||
5 | FOUNDATION HEATING | 4-MONTHS | LSTK INSTALLATION OF THE FOLLOWING ELECTRICAL | SHARQ/SABIC | FOSTER WHEELER |
SYSTEM FOR TANKS | 2007-2008 | AND HEATING SYSTEM WORK. | FOSTER WHEELER | ACBI LTD | |
AT SHARQ-III EXPENSION | 1. ELECTRICAL | ||||
PROJ.# 1-14-2460/2519 | a. Marshaling Panel for Heating system | ||||
JUBAIL IND. CITY | b. Marshaling Panel for Cool down system | ||||
c. Control Panel for Heating / Cool Down system | |||||
d. Power JB’s for Heating elements/RTD’s | |||||
e. Power / Heating Cable | |||||
f. RTD’s for Heating / Cool Down system | |||||
g. Cable trys, Conduit & Fitting | |||||
h. Grounding system | |||||
6 | CASE WORK & GAS | 3-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | IBN-ZAHR | DAELIM/KCC |
TUBING NET WORK AT | 2008 | DAELIM S.A. | JUBAIL | ||
LAB BUILDING IBN-ZAHR | 1. GAS PIPING + BUNKER | ||||
JUBAIL IND. CITY | a. Installation of SS-Tubing network for the | ||||
following gases & Utilities: | |||||
* HE ( HELIUM ) | |||||
* N2 ( NITROGEN ) | |||||
* O2 ( OXYGEN ) | |||||
* ARGON | |||||
* IA ( INST. AIR ) | |||||
* PW ( PORTABLE WATER ) | |||||
* NO ( NITREX OXIDE ) | |||||
* 3-Stage Manifolds | |||||
* Air Seperator Filter System | |||||
* Testing & Commissioning | |||||
2. CASE WORK | |||||
a. Installation of LAB Accessories for the following | |||||
* Fume Hood | |||||
* Work Benches | |||||
* Plumbing for Case Work | |||||
* Electrical for Case work | |||||
* Power Out let & wiring & termination | |||||
* Data Out let wiring & termination | |||||
7 | CASE WORK & GAS | 4-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | SIPCHEM | FLOUR S.A |
UTILITIES NETWORK AT | 2008 | 1. GAS PIPING + BUNKER | JUBAIL | ||
SAUDI INTERNATIONAL | a. Installation of SS-Tubing network for the | ||||
PETRO CHEMICAL CO. | following gases & Utilities: | ||||
SIPCHEM – JUBAIL | * HE ( HELIUM ) | ||||
CONTRACT#JAC-C-173-B | * N2 ( NITROGEN ) | ||||
* O2 ( OXYGEN ) | |||||
* ARGON | |||||
* IA ( INST. AIR ) | |||||
* PW ( PORTABLE WATER ) | |||||
* NO ( NITREX OXIDE ) | |||||
* 3-Stage Manifolds | |||||
* Air Seperator Filter System | |||||
* Testing & Commissioning | |||||
2. CASE WORK | |||||
a. Installation of LAB Accessories for the following | |||||
* Fume Hood | |||||
* Work Benches | |||||
* Plumbing for Case Work | |||||
* Electrical for Case work | |||||
* Power Out let | |||||
* Data Out let | |||||
* Wiring & Termination | |||||
8 | ELECTRICAL & | 06-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION AT | 2008 | ELECTRICAL & INSTRUMENTATION WORKS | SAUDI ARAMCO | AL-KHODARI | |
TURAIF BULK PLANT-X20 | 1. ELECTRICAL | & SONS CO. | |||
SAUDI ARAMCO | a. Power Bus Ducts | SAPMT | |||
JO/EWO# 10-00084/0001 | b. LV switchgears | ||||
SA-CONT#6600018226 | c. Motor control centres | ||||
SA-CONT#6600018227 | d. Panel Boards, starters, Pushbutton stations. | ||||
e.Disconnect switches | |||||
f. Cable trays, conduits and fittings | |||||
g LV cables | |||||
h. Control cables | |||||
i. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. Digital & Analog process instruments | |||||
b. Digital & Analog Field Junction Boxes. | |||||
c. Calibration of field instruments | |||||
d. Cable trays, conduits and fittings | |||||
e. Control, digital & analog cables | |||||
f. Termination & loop checks | |||||
g. Precommissioning & Plant startup. | |||||
9 | ELECTRICAL & | 06-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SAUDI ARAMCO | AL-KHODARI |
INSTRUMENTATION AT | 2008 | ELECTRICAL & INSTRUMENTATION WORKS | & SONS CO. | ||
JOUF BULK PLANT-X19 | 1. ELECTRICAL | SAPMT | |||
SAUDI ARAMCO | a. Power Bus Ducts | ||||
JO/EWO# 10-00084/0001 | b. LV switchgears | ||||
SA-CONT#6600018226 | c. Motor control centres | ||||
SA-CONT#6600018227 | d. Panel Boards, starters, Pushbutton stations. | ||||
e.Disconnect switches | |||||
f. Cable trays, conduits and fittings | |||||
g LV cables | |||||
h. Control cables | |||||
i. Plant Lighting & Power Distribution network | |||||
10 | ELECTRICAL & | 06-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SAUDI ARAMCO | AL-KHODARI |
INSTRUMENTATION AT | 2008 | ELECTRICAL & INSTRUMENTATION WORKS | & SONS CO. | ||
JOUF BULK PLANT-X19 | 1. ELECTRICAL | SAPMT | |||
SAUDI ARAMCO | a. Power Bus Ducts | ||||
JO/EWO# 10-00084/0001 | b. LV switchgears | ||||
SA-CONT#6600018226 | c. Motor control centres | ||||
SA-CONT#6600018227 | d. Panel Boards, starters, Pushbutton stations. | ||||
e.Disconnect switches | |||||
f. Cable trays, conduits and fittings | |||||
g LV cables | |||||
h. Control cables | |||||
i. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. Digital & Analog process instruments | |||||
b. Digital & Analog Field Junction Boxes. | |||||
c. Calibration of field instruments | |||||
d. Cable trays, conduits and fittings | |||||
e. Control, digital & analog cables | |||||
f. Termination & loop checks | |||||
g. Precommissioning & Plant startup. | |||||