Electrical & Instrumentation Work (I&C)

NO. PROJECT & LOCATION DURATION SCOPE OF WORK OWNER / CLIENT INSPECTION /
SUPERVISION
1 ELECTRICAL & 6-MONTHS LSTK INSTALLATION OF THE FOLLOWING SAUDI ARAMCO
  INSTRUMENTATION 2005-2006 ELECTRICAL, INSTRUMENTATION AND SCADA Saudi Aramco INSPECTIONS
  AND SCADA SYSTEMS FOR RTUS ON WELL HEADS DEPARTMENT
FOR HARADH GOSP-3   1. ELECTRICAL
STARTUP WELLS a. Main Power supply
HARADH, SAUDI ARABIA b. L.V Transformers
c. Power Panel Boards
d. Starters, Pushbutton stations.
e. Disconnect switches
f. Switch Racks, Cable trays, conduits and fittings
g. LV cables
2. INSTRUMENTATION WORKS
a. DCS Marshalling Cabinets
b. SCADA control cabinets
c. Digital & Analog process instruments
d. Digital & Analog Field Junction Boxes.
e. Calibration of field instruments
f. Switch Racks, Cable trays, RGS/PVC coated
   conduits and fittings
g. Control, instrumentation & comm: cables
h. Termination & loop checks
i.  Precommissioning & startup.
2 ELECTRICAL & 8-MONTHS LSTK INSTALLATION OF THE FOLLOWING
  INSTRUMENTATION 2006-2007 ELECTRICAL & INSTRUMENTATION WORKS Saudi German Saudi Engineering
   AT SAUDI GERMAN PLANT   1. ELECTRICAL Industries-Dammam Dammam
FOR NON WOVEN FIBRE a. MV Package substations
DAMMAM INDUSTRIAL b. Ring Main Units
AREA-II c. Distribution Transformers
d. LV switchgears
e. Power Bus Ducts
f. Motor control centres
g. Panel Boards, starters, Pushbutton stations.
h. Disconnect switches
i.  Lighting system
k. Pipe Racks, Cable trays, conduits and fittings
l.  HV/LV cables
      m Control cables    
2. INSTRUMENTATION WORKS
a. DCS Marshalling Cabinets
b. DCS control consoles
c. Digital & Analog process instruments
d. Digital & Analog Field Junction Boxes.
e. Calibration of field instruments
f. Pipe Racks, Cable trays, conduits and fittings
g. Control, digital & analog cables
h. Termination & loop checks
h. Precommissioning & Plant startup.
3 ELECTRICAL & 12-MONTHS LSTK INSTALLATION OF THE FOLLOWING
  INSTRUMENTATION 2006-2007 ELECTRICAL & INSTRUMENTATION WORKS JANA HASSAD
   AT JANA PLANT   1. ELECTRICAL
JUBAIL INDUSTRIAL a. MV switchgear Lineup
AREA b. Power Transformers
c. Distribution Transformers
d. Rectifier transformers
e. Power Bus Ducts
f. LV switchgears
g. Motor control centres
h. Power factor correction equipment
i. Panel Boards, starters, Pushbutton stations.
k.Disconnect switches
l. Pipe Racks, Cable trays, conduits and fittings
m HV/LV cables
n. Control cables
0.  Plant Lighting & Power Distribution network
  2. INSTRUMENTATION WORKS
a. DCS Marshalling Cabinets
b. DCS control consoles
c. Digital & Analog process instruments
d. Digital & Analog Field Junction Boxes.
e. Calibration of field instruments
f. Pipe Racks, Cable trays, conduits and fittings
g. Control, digital & analog cables
h. Termination & loop checks
h. Precommissioning & Plant startup.
  3. COMMUNICATION WORKS
a. Cable trays, RGS conduits and fittings
b. SCADA control consoles
c. Data cables
d. Data outlets
e. Termination & loop checks
f. Precommissioning & startup.
4 TIMELINE SADAF 1.5-MONTH DCS CONTROL, HMI & ELECTROMECHANICAL SADAF ABB-
  EDC T/A 2007 Jan-Feb 2007 WORKS DURING SHUTDOWN PERIOD SWITZERLAND
  SAUDI PETROCHEMICAL   1. CONTROL ROOM
  CO. (SADAF) JUBAIL a. Removal of existing HMI.
b. Installation of New HMI
c. Disconnect & removal of existing control cables
d. Installation of New Control cables from
    Marshalling rack to New HMI
f. Modification of existing DCs Panel to increase
   Capacity
  2. RECTIFIER TRANSFORMERS – 6 EA
a Dismental & remove existing power & control
   wiring for rectifier transformers including control
   panel.
b. Installation of New control panel for rectifier
    transformers.
c. Modification work at Pan alarm panel
d. Installation of cotnrol & communication wiring
    from rectifier transformer and marshalling racks.
e. Preloop checks & final loop checks.
f. Replacement of RTD’s at rectifier transformer
g. Replacemnt of existing switches & transmitter.
  3. MECHANICAL WORKS
a. Cleaning of rectifier transformer bushing with
   Demi water.
b. Replacement of gaskits.
c. Replacement of mehcanical piping at various
    Locations.
d. Re-circulation & Dehumidification of
5 FOUNDATION HEATING 4-MONTHS LSTK INSTALLATION OF THE FOLLOWING ELECTRICAL SHARQ/SABIC FOSTER WHEELER
  SYSTEM FOR TANKS 2007-2008 AND HEATING SYSTEM WORK. FOSTER WHEELER ACBI LTD
  AT SHARQ-III EXPENSION   1. ELECTRICAL
  PROJ.# 1-14-2460/2519 a. Marshaling Panel for Heating system
  JUBAIL IND. CITY b. Marshaling Panel for Cool down system
c. Control Panel for Heating / Cool Down system
d. Power JB’s for Heating elements/RTD’s
e. Power / Heating Cable
f. RTD’s for Heating / Cool Down system
g. Cable trys, Conduit & Fitting
h. Grounding system
6 CASE WORK & GAS 3-MONTHS LSTK INSTALLATION OF THE FOLLOWING SYSTEM IBN-ZAHR DAELIM/KCC
  TUBING NET WORK AT 2008 DAELIM S.A. JUBAIL
  LAB BUILDING IBN-ZAHR   1. GAS PIPING + BUNKER
  JUBAIL IND. CITY a. Installation of SS-Tubing network for the
    following gases & Utilities:
    * HE ( HELIUM )
    * N2 ( NITROGEN )
    * O2 ( OXYGEN )
    * ARGON
    * IA ( INST. AIR )
    * PW ( PORTABLE WATER )
    * NO ( NITREX OXIDE )
    * 3-Stage Manifolds
    * Air Seperator Filter System
    * Testing & Commissioning
  2. CASE WORK
a. Installation of LAB Accessories for the following
    * Fume Hood
    * Work Benches
    * Plumbing for Case Work
    * Electrical for Case work
    * Power Out let & wiring & termination
    * Data Out let wiring & termination
7 CASE WORK & GAS 4-MONTHS LSTK INSTALLATION OF THE FOLLOWING SYSTEM SIPCHEM FLOUR S.A
  UTILITIES NETWORK AT 2008 1. GAS PIPING + BUNKER JUBAIL
  SAUDI INTERNATIONAL a. Installation of SS-Tubing network for the
  PETRO CHEMICAL CO.     following gases & Utilities:
  SIPCHEM – JUBAIL     * HE ( HELIUM )
  CONTRACT#JAC-C-173-B     * N2 ( NITROGEN )
    * O2 ( OXYGEN )
    * ARGON
    * IA ( INST. AIR )
    * PW ( PORTABLE WATER )
    * NO ( NITREX OXIDE )
    * 3-Stage Manifolds
    * Air Seperator Filter System
    * Testing & Commissioning
  2. CASE WORK
a. Installation of LAB Accessories for the following
    * Fume Hood
    * Work Benches
    * Plumbing for Case Work
    * Electrical for Case work
    * Power Out let
    * Data Out let
    * Wiring & Termination
8 ELECTRICAL & 06-MONTHS LSTK INSTALLATION OF THE FOLLOWING
  INSTRUMENTATION AT 2008 ELECTRICAL & INSTRUMENTATION WORKS SAUDI ARAMCO AL-KHODARI
  TURAIF BULK PLANT-X20   1. ELECTRICAL & SONS CO.
  SAUDI ARAMCO a. Power Bus Ducts SAPMT
  JO/EWO# 10-00084/0001 b. LV switchgears
  SA-CONT#6600018226 c. Motor control centres
  SA-CONT#6600018227 d. Panel Boards, starters, Pushbutton stations.
e.Disconnect switches
f. Cable trays, conduits and fittings
g LV cables
h. Control cables
i.  Plant Lighting & Power Distribution network
  2. INSTRUMENTATION WORKS
a. Digital & Analog process instruments
b. Digital & Analog Field Junction Boxes.
c. Calibration of field instruments
d.  Cable trays, conduits and fittings
e. Control, digital & analog cables
f. Termination & loop checks
g. Precommissioning & Plant startup.
9 ELECTRICAL & 06-MONTHS LSTK INSTALLATION OF THE FOLLOWING SAUDI ARAMCO AL-KHODARI
  INSTRUMENTATION AT 2008 ELECTRICAL & INSTRUMENTATION WORKS & SONS CO.
  JOUF BULK PLANT-X19   1. ELECTRICAL SAPMT
  SAUDI ARAMCO a. Power Bus Ducts
  JO/EWO# 10-00084/0001 b. LV switchgears
  SA-CONT#6600018226 c. Motor control centres
  SA-CONT#6600018227 d. Panel Boards, starters, Pushbutton stations.
e.Disconnect switches
f. Cable trays, conduits and fittings
g LV cables
h. Control cables
i.  Plant Lighting & Power Distribution network
10 ELECTRICAL & 06-MONTHS LSTK INSTALLATION OF THE FOLLOWING SAUDI ARAMCO AL-KHODARI
  INSTRUMENTATION AT 2008 ELECTRICAL & INSTRUMENTATION WORKS & SONS CO.
  JOUF BULK PLANT-X19   1. ELECTRICAL SAPMT
  SAUDI ARAMCO a. Power Bus Ducts
  JO/EWO# 10-00084/0001 b. LV switchgears
  SA-CONT#6600018226 c. Motor control centres
  SA-CONT#6600018227 d. Panel Boards, starters, Pushbutton stations.
e.Disconnect switches
f. Cable trays, conduits and fittings
g LV cables
h. Control cables
i.  Plant Lighting & Power Distribution network
  2. INSTRUMENTATION WORKS
a. Digital & Analog process instruments
b. Digital & Analog Field Junction Boxes.
c. Calibration of field instruments
d.  Cable trays, conduits and fittings
e. Control, digital & analog cables
f. Termination & loop checks
g. Precommissioning & Plant startup.