NO. | PROJECT & LOCATION | DURATION | SCOPE OF WORK | OWNER / CLIENT | INSPECTION / |
SUPERVISION | |||||
1 | ELECTRICAL & | 6-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SAUDI ARAMCO | |
INSTRUMENTATION | 2005-2006 | ELECTRICAL, INSTRUMENTATION AND SCADA | Saudi Aramco | INSPECTIONS | |
AND SCADA | SYSTEMS FOR RTUS ON WELL HEADS | DEPARTMENT | |||
FOR HARADH GOSP-3 | 1. ELECTRICAL | ||||
STARTUP WELLS | a. Main Power supply | ||||
HARADH, SAUDI ARABIA | b. L.V Transformers | ||||
c. Power Panel Boards | |||||
d. Starters, Pushbutton stations. | |||||
e. Disconnect switches | |||||
f. Switch Racks, Cable trays, conduits and fittings | |||||
g. LV cables | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. SCADA control cabinets | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Switch Racks, Cable trays, RGS/PVC coated | |||||
conduits and fittings | |||||
g. Control, instrumentation & comm: cables | |||||
h. Termination & loop checks | |||||
i. Precommissioning & startup. | |||||
2 | ELECTRICAL & | 6-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SAUDI ARAMCO | |
COMMUNICATION WORKS | 2005-2006 | ELECTRICAL, ELECTRICAL AND COMM: | Saudi Aramco | INSPECTIONS | |
FOR SCADA SYSTEM | SYSTEMS | DEPARTMENT | |||
AT UTHMANIYAH | 1. ELECTRICAL | ||||
GAS PLANT | a. Main Power supply | ||||
UTHMANIYAH, SAUDI ARABIA | b. L.V Transformers | ||||
c. Power Panel Boards | |||||
d. Disconnect switches | |||||
e. RGS conduits and fittings | |||||
f. LV cables | |||||
2. COMMUNICATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. SCADA control consoles | |||||
c. Cable trays, RGS conduits and fittings | |||||
d. Data cables | |||||
e. Data outlets | |||||
f. Termination & loop checks | |||||
g. Precommissioning & startup. | |||||
3 | ELECTRICAL & | 8-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION | 2006-2007 | ELECTRICAL & INSTRUMENTATION WORKS | Saudi German | Saudi Engineering | |
AT SAUDI GERMAN PLANT | 1. ELECTRICAL | Industries-Dammam | Dammam | ||
FOR NON WOVEN FIBRE | a. MV Package substations | ||||
DAMMAM INDUSTRIAL | b. Ring Main Units | ||||
AREA-II | c. Distribution Transformers | ||||
d. LV switchgears | |||||
e. Power Bus Ducts | |||||
f. Motor control centres | |||||
g. Panel Boards, starters, Pushbutton stations. | |||||
h. Disconnect switches | |||||
i. Lighting system | |||||
k. Pipe Racks, Cable trays, conduits and fittings | |||||
l. HV/LV cables | |||||
m Control cables | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. DCS control consoles | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Pipe Racks, Cable trays, conduits and fittings | |||||
g. Control, digital & analog cables | |||||
h. Termination & loop checks | |||||
h. Precommissioning & Plant startup. | |||||
4 | ELECTRICAL & | 12-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION | 2006-2007 | ELECTRICAL & INSTRUMENTATION WORKS | JANA | HASSAD | |
AT JANA PLANT | 1. ELECTRICAL | ||||
JUBAIL INDUSTRIAL | a. MV switchgear Lineup | ||||
AREA | b. Power Transformers | ||||
c. Distribution Transformers | |||||
d. Rectifier transformers | |||||
e. Power Bus Ducts | |||||
f. LV switchgears | |||||
g. Motor control centres | |||||
h. Power factor correction equipment | |||||
i. Panel Boards, starters, Pushbutton stations. | |||||
k.Disconnect switches | |||||
l. Pipe Racks, Cable trays, conduits and fittings | |||||
m HV/LV cables | |||||
n. Control cables | |||||
0. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. DCS control consoles | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Pipe Racks, Cable trays, conduits and fittings | |||||
g. Control, digital & analog cables | |||||
h. Termination & loop checks | |||||
h. Precommissioning & Plant startup. | |||||
3. COMMUNICATION WORKS | |||||
a. Cable trays, RGS conduits and fittings | |||||
b. SCADA control consoles | |||||
c. Data cables | |||||
d. Data outlets | |||||
e. Termination & loop checks | |||||
f. Precommissioning & startup. | |||||
5 | ELECTRICAL WORKS | 08-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
AT BISCHOF + KLIEN | 2006-2007 | ELECTRICAL & INSTRUMENTATION WORKS | BISHOF + KLIEN | B+K | |
MIDDLE EAST CO. | 1. ELECTRICAL | MIDDLE EAST CO. | |||
DAMMAM INDUSTRIAL | a. Ring Main Units | ||||
AREA – II | b. Distribution Transformers | ||||
c. LV switchgears | |||||
d. Power Bus Ducts | |||||
e. Motor control centres | |||||
f. Panel Boards, starters, Pushbutton stations. | |||||
g. Disconnect switches | |||||
h. Lighting system | |||||
i. Cable trays, conduits and fittings | |||||
j. HV/LV cables | |||||
k Control cables | |||||
l. Fire Alarm System | |||||
6 | TIMELINE SADAF | 1.5-MONTH | DCS CONTROL, HMI & ELECTROMECHANICAL | SADAF | ABB |
EDC T/A 2007 | Jan-Feb 2007 | WORKS DURING SHUTDOWN PERIOD | SWITZERLAND | ||
SAUDI PETROCHEMICAL | 1. CONTROL ROOM | ||||
CO. (SADAF) JUBAIL | a. Removal of existing HMI. | ||||
b. Installation of New HMI | |||||
c. Disconnect & removal of existing control cables | |||||
d. Installation of New Control cables from | |||||
Marshalling rack to New HMI | |||||
f. Modification of existing DCs Panel to increase | |||||
Capacity | |||||
2. RECTIFIER TRANSFORMERS – 6 EA | |||||
a Dismental & remove existing power & control | |||||
wiring for rectifier transformers including control | |||||
panel. | |||||
b. Installation of New control panel for rectifier | |||||
transformers. | |||||
c. Modification work at Pan alarm panel | |||||
d. Installation of cotnrol & communication wiring | |||||
from rectifier transformer and marshalling racks. | |||||
e. Preloop checks & final loop checks. | |||||
f. Replacement of RTD’s at rectifier transformer | |||||
g. Replacemnt of existing switches & transmitter. | |||||
3. MECHANICAL WORKS | |||||
a. Cleaning of rectifier transformer bushing with | |||||
Demi water. | |||||
b. Replacement of gaskits. | |||||
c. Replacement of mehcanical piping at various | |||||
Locations. | |||||
d. Re-circulation & Dehumidification of | |||||
transformer oil. | |||||
7 | FOUNDATION HEATING | 4-MONTHS | LSTK INSTALLATION OF THE FOLLOWING ELECTRICAL | SHARQ/SABIC | FOSTER WHEELER |
SYSTEM FOR TANKS | 2007-2008 | AND HEATING SYSTEM WORK. | FOSTER WHEELER | ACBI LTD | |
AT SHARQ-III EXPENSION | 1. ELECTRICAL | ||||
PROJ.# 1-14-2460/2519 | a. Marshaling Panel for Heating system | ||||
JUBAIL IND. CITY | b. Marshaling Panel for Cool down system | ||||
c. Control Panel for Heating / Cool Down system | |||||
d. Power JB’s for Heating elements/RTD’s | |||||
e. Power / Heating Cable | |||||
f. RTD’s for Heating / Cool Down system | |||||
g. Cable trys, Conduit & Fitting | |||||
h. Grounding system | |||||
8 | HVAC / FIRE FIGHTING | 06-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
WORKS AT IBN-ZAHR | 2007-2008 | HVAC & FIRE FIGHTING SYSTEM | IBN-ZAHR | DAELIM/KCC | |
EXPENSION PROJECT | 1. HVAC | DAELIM S.A. | JUBAIL | ||
JUBAIL INDUSTRIAL CITY | a. 50-Ton Package A/C units | ||||
b. 5-Ton Split A/C units | |||||
c. Power and Control Cables | |||||
d. Control Panel | |||||
e. Duct Work, Insulation & Cladding | |||||
f. Refrigerant Piping, Instulation & Cladding | |||||
g. Cable Tray Conduit & Fittings | |||||
h. Testing & Commissioning | |||||
2. FIRE FIGHTING | |||||
a. Above Ground Fire Water Piping System | |||||
b. FM-200 System | |||||
c. Fire Hydrant & Assocciate Equipment | |||||
d. Tesing & Commissioning | |||||
9 | CASE WORK & GAS | 3-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | IBN-ZAHR | DAELIM/KCC |
TUBING NET WORK AT | 2008 | DAELIM S.A. | JUBAIL | ||
LAB BUILDING IBN-ZAHR | 1. GAS PIPING + BUNKER | ||||
JUBAIL IND. CITY | a. Installation of SS-Tubing network for the | ||||
following gases & Utilities: | |||||
* HE ( HELIUM ) | |||||
* N2 ( NITROGEN ) | |||||
* O2 ( OXYGEN ) | |||||
* ARGON | |||||
* IA ( INST. AIR ) | |||||
* PW ( PORTABLE WATER ) | |||||
* NO ( NITREX OXIDE ) | |||||
* 3-Stage Manifolds | |||||
* Air Seperator Filter System | |||||
* Testing & Commissioning | |||||
2. CASE WORK | |||||
a. Installation of LAB Accessories for the following | |||||
* Fume Hood | |||||
* Work Benches | |||||
* Plumbing for Case Work | |||||
* Electrical for Case work | |||||
* Power Out let | |||||
* Data Out let | |||||
* Wiring & Termination | |||||
10 | CASE WORK & GAS | 4-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | SIPCHEM | FLOUR S.A |
UTILITIES NETWORK AT | 2008 | 1. GAS PIPING + BUNKER | JUBAIL | ||
SAUDI INTERNATIONAL | a. Installation of SS-Tubing network for the | ||||
PETRO CHEMICAL CO. | following gases & Utilities: | ||||
SIPCHEM – JUBAIL | * HE ( HELIUM ) | ||||
CONTRACT#JAC-C-173-B | * N2 ( NITROGEN ) | ||||
* O2 ( OXYGEN ) | |||||
* ARGON | |||||
* IA ( INST. AIR ) | |||||
* PW ( PORTABLE WATER ) | |||||
* NO ( NITREX OXIDE ) | |||||
* 3-Stage Manifolds | |||||
* Air Seperator Filter System | |||||
* Testing & Commissioning | |||||
2. CASE WORK | |||||
a. Installation of LAB Accessories for the following | |||||
* Fume Hood | |||||
* Work Benches | |||||
* Plumbing for Case Work | |||||
* Electrical for Case work | |||||
* Power Out let | |||||
* Data Out let | |||||
* Wiring & Termination | |||||
11 | ELECTRICAL & | 06-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION AT | 2008 | ELECTRICAL & INSTRUMENTATION WORKS | SAUDI ARAMCO | AL-KHODARI | |
TURAIF BULK PLANT-X20 | 1. ELECTRICAL | & SONS CO. | |||
SAUDI ARAMCO | a. Power Bus Ducts | SAPMT | |||
JO/EWO# 10-00084/0001 | b. LV switchgears | ||||
SA-CONT#6600018226 | c. Motor control centres | ||||
SA-CONT#6600018227 | d. Panel Boards, starters, Pushbutton stations. | ||||
e.Disconnect switches | |||||
f. Cable trays, conduits and fittings | |||||
g LV cables | |||||
h. Control cables | |||||
i. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. Digital & Analog process instruments | |||||
b. Digital & Analog Field Junction Boxes. | |||||
c. Calibration of field instruments | |||||
d. Cable trays, conduits and fittings | |||||
e. Control, digital & analog cables | |||||
f. Termination & loop checks | |||||
g. Precommissioning & Plant startup. | |||||
12 | ELECTRICAL & | 06-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SAUDI ARAMCO | AL-KHODARI |
INSTRUMENTATION AT | 2008 | ELECTRICAL & INSTRUMENTATION WORKS | & SONS CO. | ||
JOUF BULK PLANT-X19 | 1. ELECTRICAL | SAPMT | |||
SAUDI ARAMCO | a. Power Bus Ducts | ||||
JO/EWO# 10-00084/0001 | b. LV switchgears | ||||
SA-CONT#6600018226 | c. Motor control centres | ||||
SA-CONT#6600018227 | d. Panel Boards, starters, Pushbutton stations. | ||||
e.Disconnect switches | |||||
f. Cable trays, conduits and fittings | |||||
g LV cables | |||||
h. Control cables | |||||
i. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. Digital & Analog process instruments | |||||
b. Digital & Analog Field Junction Boxes. | |||||
c. Calibration of field instruments | |||||
d. Cable trays, conduits and fittings | |||||
e. Control, digital & analog cables | |||||
f. Termination & loop checks | |||||
g. Precommissioning & Plant startup. | |||||
13 | HVAC / FIRE FIGHTING | 04-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
WORKS AT LAB BUILDING | 2008 | HVAC & FIRE FIGHTING SYSTEM | AR-RAZI | MHI / KCC | |
AR-RAZI METHONAL | 1. HVAC | MHI | JUBAIL | ||
PROJECT PLANT-V | a. 50-Ton Package A/C units | ||||
JUBAIL INDUSTRIAL CITY | b. 5-Ton Split A/C units | ||||
Contract# 533570 | c. Power and Control Cables | ||||
d. Control Panel | |||||
e. Duct Work, Insulation & Cladding | |||||
f. Refrigerant Piping, Instulation & Cladding | |||||
g. Cable Tray Conduit & Fittings | |||||
h. Testing & Commissioning | |||||
2. FIRE FIGHTING | |||||
a. Above Ground Fire Water Piping System | |||||
b. FM-200 System | |||||
c. Fire Hydrant & Assocciate Equipment | |||||
d. Tesing & Commissioning | |||||
14 | HVAC WORKS AT | 3-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SASREF | SASREF / |
AT SASREF JUBAIL | 2008 | HVAC SYSTEM | CARRIER | ||
a- 50 Ton Package A/C Units | |||||
b. Power and Control Cables | |||||
c. Control Panel | |||||
d. Duct Work, Insulation & Cladding | |||||
e. Refrigerant Piping, Instulation & Cladding | |||||
f. Cable Tray Conduit & Fittings | |||||
g. Testing & Commissioning | |||||
15 | ONLINE ANALYZER FOR | 2-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | SASREF | SASREF / |
OIL & BENZENE | 2008 | ABDULALH FOUAD | |||
AT SASREF JUBAIL | a- Analyzer | ||||
b- Cable Tray Conduit & Fittings | |||||
c- Sampling Tube Laying & termination. | |||||
d. Power and Control Cables | |||||
e- Hookup with DCS in Control Room. | |||||
16 | ELECTRICAL & | 8-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
INSTRUMENTATION | 2009 | ELECTRICAL & INSTRUMENTATION WORKS | PROCTER & GAMBLE | MIC / | |
AT CORNFLAKE PLANT | 1. ELECTRICAL | CHEMOPRAG, | |||
2ND INDUSTRIAL CITY | a. MV switchgear Lineup | CHEZK REPUBLIC | |||
DAMMAM | b. Power Transformers | ||||
c. Distribution Transformers | |||||
d. Rectifier transformers | |||||
e. Power Bus Ducts | |||||
f. LV switchgears | |||||
g. Motor control centres | |||||
h. Power factor correction equipment | |||||
i. Panel Boards, starters, Pushbutton stations. | |||||
k.Disconnect switches | |||||
l. Pipe Racks, Cable trays, conduits and fittings | |||||
m HV/LV cables | |||||
n. Control cables | |||||
0. Plant Lighting & Power Distribution network | |||||
2. INSTRUMENTATION WORKS | |||||
a. DCS Marshalling Cabinets | |||||
b. DCS control consoles | |||||
c. Digital & Analog process instruments | |||||
d. Digital & Analog Field Junction Boxes. | |||||
e. Calibration of field instruments | |||||
f. Pipe Racks, Cable trays, conduits and fittings | |||||
g. Control, digital & analog cables | |||||
h. Termination & loop checks | |||||
h. Precommissioning & Plant startup. | |||||
17 | HVAC / FIRE FIGHTING / | 1-YEAR | LSTK INSTALLATION OF THE FOLLOWING | ||
ELECTRICAL / BMS WORKS | 2009-2010 | HVAC & FIRE FIGHTING SYSTEM | AAC ETHYLENE | AAC / | |
AT AAC ETHYLENE AMINES | 1. HVAC | AMINE | HANWHA SAUDI | ||
PLANT | a. Chiller | CONTRACTING CO. | |||
JUBAIL INDUSTRIAL CITY | b. Package units | LTD. | |||
Contract# HSCC-AAC-027 | c. Splilt units | ||||
d. AHUs | |||||
e. HRUs, ARUs, EFU | |||||
f. Power & Control Cables | |||||
g. Control Panel | |||||
h. Duct work, Insulation & Cladding | |||||
i. Refrigerant Piping, Insulation & Cladding | |||||
j. Cable Tray, Conduit & Fittings | |||||
k. Testing & Commissioning | |||||
2. FIRE FIGHTING | |||||
a. Above Ground Fire Water Piping System | |||||
b. FM-200 System | |||||
c. Fire Hydrant & Associate Equipment | |||||
d. Testing & Commissioning | |||||
3. PLUMBING | |||||
a. Hot & Cold water system | |||||
b. Drain & Sewer water system | |||||
c. Chemical Drainage system | |||||
d. Plumbing Fixtures & Fittings | |||||
e. Eye wash & Safety Shower | |||||
f. Copper piping Networks | |||||
18 | ELECTRICAL WORKS FOR | 4-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
NEW PSG BUILDING | 2009-2010 | ELECTRICAL & DATA NETWORKING | PROCTER & GAMBLE | MIC | |
AT PROCTOR & GAMBLE | 1. ELECTRICAL | ||||
MODERN INDUS. CO. | a. LV switchgear Lineup | ||||
DAMMAM | b. Distribution Transformers | ||||
c. Motor control centres | |||||
d. Panel Boards, starters, Pushbutton stations. | |||||
e. Disconnect switches | |||||
f. Pipe Racks, Cable trays, conduits and fittings | |||||
g. LV cables | |||||
h. Control cables | |||||
i. Plant Lighting & Power Distribution network | |||||
2. TELEPHONE & DATA NETWORKS | |||||
a. Data Panels | |||||
b. Telephone & Data Outlets | |||||
C. Patch Cords & Patch Panels | |||||
d. Cable trays, conduits and fittings | |||||
e. Termination & loop checks | |||||
f. Precommissioning & startup. | |||||
19 | MEDUIM VOLTAGE | 3-MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
POWER DISTRIBUTION | 2010 | ELECTRICAL WORKS | PROCTER & GAMBLE | MIC | |
NETWORKS @ | 1. ELECTRICAL | ||||
P&G / MIC | a. MV Package substations | ||||
DAMMAM INDUSTRIAL | b. Ring Main Units | ||||
AREA-II | c. Distribution Transformers | ||||
d. LV switchgears | |||||
e. Power Bus Ducts | |||||
f. Motor control centres | |||||
g. MV REYCHEM Termination & Hi-pot | |||||
h. Pipe Racks, Cable trays, conduits and fittings | |||||
l. HV/LV cables | |||||
20 | CASE WORK & GAS | 8-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | ||
UTILITIES NETWORK AT | 2010 | 1. GAS PIPING + BUNKER | TASNEE | AFM CONSULTING | |
TASNEE PLASTIC RESEARCH | a. Installation of SS-Tubing network for the | H&H SCIENTIFIC | |||
CENTER – JUBAIL | following gases & Utilities: | CANADA | |||
CONTRACT#4500014754 | * HE ( HELIUM ) | ||||
* N2 ( NITROGEN ) | |||||
* O2 ( OXYGEN ) | |||||
* ARGON | |||||
* IA ( INST. AIR ) | |||||
* PW ( PORTABLE WATER ) | |||||
* NO ( NITREX OXIDE ) | |||||
* 3-Stage Manifolds | |||||
* Air Seperator Filter System | |||||
* Testing & Commissioning | |||||
2. CASE WORK | |||||
a. Installation of LAB Accessories for the following | |||||
* Fume Hood | |||||
* Work Benches | |||||
* Plumbing for Case Work | |||||
* Electrical for Case work | |||||
* Power Out let | |||||
* Data Out let | |||||
* Wiring & Termination | |||||
21 | ELECTRO MECHANICAL | 9-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | ||
WORKS AT | 2010 | TASNEE | AFM CONSULTING | ||
TASNEE PLASTIC RESEARCH | 1. PROCESS COOLING SYSTEM | ||||
CENTER – JUBAIL | a. 200 Ton Chiller | ||||
CONTRACT#4500016585 | b. Heat Exchanger, ch.water pump, pw pumps | ||||
c. 6″ chiller water line for all process machines | |||||
d. 3″ chilled water riser to the headers, | |||||
e. Complete system upto the commissioning. | |||||
2. COMPRESSED AIR SYSTEM | |||||
a. 2″ air line to all process machines | |||||
b. Compressor and filtration system including | |||||
tank | |||||
c. Commissioning of complete system | |||||
3. MACHINE ERECTION | |||||
a. Below film line | |||||
b. Small injector | |||||
c. Large below film line | |||||
d. Large injector machine | |||||
E. Pipe extruder | |||||
F. Chiller units | |||||
g. Testing & Commissioning of all Machine’s | |||||
22 | INSTALLATION OF MV/LV | 1-Year | INSTALLATION OF THE FOLLOWING | ||
CABLE NETWORK | 2010-2011 | MV/LV CABLES INCLUDING TEMINATION & TESTING | SAUDI ARAMCO | EYP / S.ARAMCO | |
INCLUDING TERMINATION | Latifia Cont. Co. Ltd. | Inspection Depart. | |||
AND TESTING AT SAUDI | a. 15-KV, Underground cables in duct bank | ||||
ARAMCO CORPORATE | b. 7.2-Kv Cables in duct bank | ||||
DATA CENTER – DHAHRAN | c. LV Cable in duct bank, cable tray & Conduits | ||||
Contract & BI NO. | d. 15-KV, splicing & terminations | ||||
6600021541 / 10-00273 | e. Dressing, termination, tagging of MV cables | ||||
f. Meggering & Hi-pot | |||||
g. Dressing, termination, tagging of LV cables | |||||
h. Insulation resistance testing of a power & control cables |
|||||
23 | INSTALLATION OF MV/LV | 1-Year | INSTALLATION OF THE FOLLOWING | ||
POWER SYSTEM EQUIPMENTS | 2011-2012 | ELECTRICAL EQUIPMENTS | SAUDI ARAMCO | EYP / S.ARAMCO | |
AT SAUDI ARAMCO | a. 13.8 KV, double ended Utility switchgears | Latifia Cont. Co. Ltd. | Inspection Depart. | ||
CORPORATE DATA CENTER | b. 13.8 KV double ended Paralleling Switchgear | ||||
DHAHRAN | c. 5 KV double ended Switchgear | ||||
Contract & BI NO. | d. 13.8KV, Automatic Transfer Switches | ||||
6600021541 / 10-00273 | e. 13.8 KV Manual Transfer Switches | ||||
f. 3.75MVA, Power transformers | |||||
g. 7.5 MVA power transpformers | |||||
h. LV Dry Type Transformers | |||||
i. 480V, double ended LV Switchgears | |||||
j. 750 KVA UPS | |||||
k. 40 KVA UPS | |||||
l. 85 KVA UPS | |||||
m. Static Transfer Switches | |||||
n. Motor Control Centers | |||||
o. Power distribution units (PDUS) | |||||
p. RPP | |||||
q. LV, Distribution Panel Boards | |||||
r. LV Automatic tranfer switches | |||||
s. DC, Disconnect Switchs | |||||
t. Batteries, battry banks & Battery Chargers | |||||
24 | INSTALLATION OF MV/LV | 1-Year | INSTALLATION OF THE FOLLOWING | ||
EMERGENCY POWER SYSTEM | 2011-2012 | a. 6-Ea, 2 MVA, 13.8 KV, Diesel engine generators | SAUDI ARAMCO | EYP / S.ARAMCO | |
AT SAUDI ARAMCO | a. 6-Ea, Diesel fuel tanks | Latifia Cont. Co. Ltd. | Inspection Depart. | ||
CORPORATE DATA CENTER | b. Fuel polishing system | ||||
DHAHRAN | c. Airintake and exhaust louvers | ||||
Contract & BI NO. | d. Sound atteneutors | ||||
6600021541 / 10-00273 | e. Control system between generators, paralleling switchgearsand central controls and monitoring system. |
||||
f. Battries and battery chargers | |||||
g. 6-Ea, Neutrall grounding resistors | |||||
25 | H V A C WORKS | 18 MONTHS | LSTK INSTALLATION OF THE FOLLOWING | ||
AT CORPORATE DATA | 2010-2012 | 1. HVAC | SAUDI ARAMCO | EYP / S.ARAMCO | |
CENTER – S. ARAMCO | a. 6-Ea, 700 tons, centifugal, water Chillers | Latifia Cont. Co. Ltd. | Inspection Depart. | ||
DHAHRAN | b. 40 Ea, Package AC units of 25 to 60 tons capacity | ||||
Contract & BI NO. | c. 103-Ea, CRAH units, each of 30 tons capacity | ||||
6600021541 / 10-00273 | d. 72 Ea, AHUs | ||||
e. HRUs, ARUs, EFU | |||||
f. Duct work, Insulation & Cladding | |||||
g. Refrigerant Piping, Insulation & Cladding | |||||
h. Chilled water Piping and insulation | |||||
i. Air Terminal Devices | |||||
j. Steam Humidifier | |||||
k. VAV’s, CAV’s, Exhuast Fan’s, Fire Smoke Dampers | |||||
l. Testing & Commissioning and balancing. | |||||
26 | POWER GENERATION FOR | 6-MONTHS | LSTK INSTALLATION OF THE FOLLOWING SYSTEM | ||
TASNEE PLASTIC RESEARCH | 2010-2011 | TASNEE | AFM CONSULTING | ||
CENTER – JUBAIL | 1. ELECTRICAL WORKS | ||||
CONTRACT#4500017184 | a. 4-Each 1000KW Power Generator | ||||
b. LV Switchgear Lineup. | |||||
c. 6000Amps ATS & Synchronizing panel. | |||||
d. LV Cable Laying & Termination. | |||||
e. Control Wiring B/W Generator/Synchronizing | |||||
Panal and ATS Panel | |||||
2. MECHANICAL WORKS | |||||
a. Installation of 4-EA.Diesel Generator 1000KW. | |||||
b. 6,000 lit. Day tank. | |||||
c. 30,000 lit. Fuel Storage Tanks. | |||||
d. Fuel Transfer Pump System. | |||||
e. Exhaust Mufflers. | |||||
f. Air Inlet & Exhaust Louvers. | |||||
g. All associated Fuel,Oil & Water sysems | |||||
including unground & above groung piping. | |||||
h. Commissioning of Power & Fuel System. | |||||
27 | HVAC ELECTRICAL | 4 MONTHS | INSTALLATION OF FOLLOWING | ||
FIRE FIGHTING & ACCESS | 2012 | FARABI | |||
CONTROL SYSTEM AT | 1. ELECTRICAL WORKS | ||||
FARABI PETRO CHEMICAL | a. Step Down Transformer | ||||
JUBAIL | b. Power Panel Board | ||||
c. HVAC Panel | |||||
d. Disconnect Switches | |||||
e. Conduit & Wiring for Transformer | |||||
f. Fire Alram System | |||||
g. Access Control System | |||||
2. MECHANICAL WORKS | |||||
a. A/C Equipment | |||||
b. Duct Work | |||||
c. Insulation | |||||
e. FM 200 System Equipment | |||||
f. FM 200 Piping & Fitting | |||||
28 | ELECTRICAL WORKS at SP-3 | 12 Months | EPC CONTRACT FOR THE FOLLOWING SCOPE | YASREF | YASREF/ S.ARAMCO |
SOLID HANDLING PACKAGE | 2013-2014 | a. 480V, LV Switchgears, MCCS. | SAUDI TECHINT | Inspection Depart. | |
YANBU, SAUDI ARABIA | b. LV Dry Type Transformers, Disconnect switches | ||||
Contract # YOE-YERP-6600025421 (IK) | c. MV Transformers | ||||
d. LV cable network including ter: & testing | |||||
e. Power & Lighting Panel Boards | |||||
f. LV ATS | |||||
g. UPS Sysyem | |||||
h. Grounding and lightning protection system | |||||
i. Security and area lighting system | |||||
29 | HVAC WORKS at SP-3 | 12 Months | EPC CONTRACT FOR THE FOLLOWING SCOPE | YASREF | YASREF/ S.ARAMCO |
SOLID HANDLING PACKAGE | 2013-2014 | a. AHUS | SAUDI TECHINT | Inspection Depart. | |
YANBU, SAUDI ARABIA | b. Package AC units | ||||
Contract # YOE-YERP-6600025421 (IK) | c. Split AC units. | ||||
d. Ductwork including insulation. | |||||
e. Air terminal devices. | |||||
f. Volume, Fire dampers, control dampers, louvers etc | |||||
30 | MECHANICAL WORKS at SP-3 SOLID HANDLING PACKAGE CONT: # YOE-YERP-6600025421 YANBU, SAUDI ARABIS |
12 Months, 2013 – 2014 | EPC CONTRACT FOR THE FOLLOWING SCOPE | YASREF | YASREF/ S.ARAMCO |
a. Discharge ductwork for Pastillator, manifolds and chimneys. |
SAUDI TECHINT | Inspection Depart. | |||
31 | CONTROL & INSTRUMENTATION WORKS at SP-7, NGL TERMINAL FACILITY, Contract # 6600028140 |
6 Months, 2013 -2014 | INSTALLATION OF THE FOLLOWING | YASREF | YASREF/ S.ARAMCO |
a. Field junction boxes. | SAUDI ARCHIRODON | Inspection Depart. | |||
b. Control & instrumentation cables | |||||
c. Field instruments | |||||
d. Cable glanding, tagging & terminations | |||||
e. Calibration of field intruments | |||||
f. Loop testing and commissioning. | |||||
32 | MEP WORKS, AT AL-ROWAD | 1-Year | INSTALLATION OF THE FOLLOWING | Al-ROWAD GLOBAL | ROWAD QC |
B.O.P.P PLANT | 2014-2015 | SCOPE OF ELECTRICAL WORKS | |||
DAMMAM INDUSTRIAL ESTATE 2 | a. 13.8 KV, Utility switchgears | ||||
SUADI ARABIA | b. Paralleling Switchgear | ||||
c. 5.6 MVA, 13.8KV Dry type power transformers | |||||
d. 13.8KV, distribution transformers | |||||
e. Bus ducts | |||||
f. 380V, LV Switchgears, MCCS | |||||
g. Plant equipment main and subdistribution panels | |||||
h. Panel boards | |||||
h. Plant lighting and small power | |||||
i. MV cable network including splicing,terminations & testing | |||||
j. LV cable network including splicing,terminations & testing | |||||
SCOPE OF MECHANICAL WORKS | |||||
a. 9-Ea, 2 MVA, 13.8 KV diesel engine generators | |||||
b. Daily fuel tanks and associated piping | |||||
c. Sound atteneutors | |||||
d Airintake and exhaust louvers | |||||
e. Battries and battery chargers | |||||
f. 6-Ea, Neutrall grounding resistors | |||||
g. Control system between generators, paralleling switchgearsand central controls and monitoring system. |
|||||
SCOPE OF MECHANICAL WORKS | |||||
a. Fabrication & installation of plant piping including fittings, gauges & instruments. |
|||||
b. Fabrication & installation of piping insulation & cladding. | |||||
d. Fabrication & installation of chilled water piping including fittings, gauges & instruments. |
|||||
e. Fabrication & installation of CW piping insulation & cladding. | |||||
f. Installation of Chillers, CW pumps including all instruments. | |||||
33 | MV CABLE NETWORK | 4 Months | INSTALLATION OF THE FOLLOWING ELECT: WORKS | SAUDI ARAMCO | S.ARAMCO |
RCTF, RIYADH REFINERY | 2014 | a. 13.8 KV, Package substations | SAMSUNG | Inspection Depart. | |
b. 15 KV cables including termination and testing. | |||||
c. Grounding | |||||